Through the spring, there has been significant progress made in the construction of Building 331. The roof is nearly finished, and windows are being installed this week. Interior framing is underway, and the boulevard extension has begun with the removal of the existing cul-de-sac. The storm water drainage system for the new boulevard extension and the building parking lot are also in progress.
Quick Menu
Latest News
- Pitching the Next Great Idea
- Regional Conference on Entrepreneurial and Workplace Development Scheduled for June 5th in Altoona
- State College Startups Compete for $10,000
- 328 Innovation Boulevard in Innovation Park at Penn State Named for Renowned Climate Modeling Pioneer Warren M. Washington
- Pilot Program Matches Penn State Tech Startups with Executive Talent
About the Park
Join Our Newsletter
Receive information on news and events at Innovation Park.
Available Space
Contact Dan Leri at (814) 865-5925
For buildings 310, 328, 329, 330 and 331 contact:
Thomas MacDonald, SIOR
Newmark, Inc at (412) 434-1028 or (412) 716-8452,
This email address is being protected from spambots. You need JavaScript enabled to view it..